Wheel Genius: Road work planned this week

Lawrence

• The roadway will be narrowed down to one lane for traffic heading westbound over the 23rd Street bridge. Crews are patching a hole in the pavement that has formed on the deck of the bridge. The road will be down to one lane until Tuesday so the concrete can cure.

• Starting Wednesday, crews will begin working on a project to add a center turn lane on Sixth Street between Folks Road and Monterey Way. During the first phase of the project, the inside lanes of both the eastbound and westbound direction will be closed in front of Hy-Vee as crews remove the raised median. The first phase should last two weeks.

• Traffic will be reduced to one lane along the 700 block of Kentucky Street as crews work to replace curbing on the west side of the street.

• On Clinton Parkway west of Kasold Drive, the right-hand turn lane and one eastbound lane will be closed for about two weeks so crews can remove concrete and pour new concrete. Southbound turns onto Kasold are allowed, but the city encourages drivers to use extra caution at the intersection.

Also as part of the project, Kasold Drive between Clinton Parkway and 31st Street has both directions of traffic traveling along the southbound lanes of Kasold. Each direction is narrowed to one lane as crews rebuild the roadway. Access from side streets is right turn only. The project is expected to last for several months.

• A portion of the Kansas River levee trail will be closed for the construction of the Bowersock Mills & Power Co.’s new plant on the north bank of the Kansas River. A detour on the trail will take users from the trail to city streets crossing at the controlled intersection of Second and Locust Streets. Signs will be clearly posted marking the detour route to direct users throughout the detour. The city urges drivers and trail users to use caution when traveling through the intersection. The detour will run for the duration of the project, which is projected to last 20 months.

• The city is in the first phase of its overlay projects. Temporary single lane closures should be expected in these areas, but traffic will most likely be able to flow through the area. For a map of the overlay projects go to www.lawrenceks.org/public_works/streetmaintenance and click on “2011 Street Maintenance Plan.”

• City maintenance crews are working on a microsurfacing program. Roads throughout the city will be repaved and resurfaced. Lane reductions and possible street closures may occur during the process. To find out what streets the city has targeted, visit the city’s website at www.ci.lawrence.ks.us.

Douglas County

• Douglas County Road 9 is closed between U.S. Highway 24-40 and Interstate 70. The road will be closed so crews can work on bridge construction. It will remain closed until late spring.

• All lanes of Douglas County Road 458/N. 1000 Road will be closed to traffic between U.S. Highway 59 and E. 1400 Road, which is about one mile east of U.S. 59. The road is being closed as part of the construction of the new interchange for U.S. 59 and so that crews can repair the bridge located about one-third mile east of U.S. 59.

Local access for resident living in the area will remain during the roadway closure. For other traffic, a marked detour will be provided along Douglas County Road 1055/E. 1500 Road and 31st Street.

The work will last until mid- to late July.

U.S. Highway 59

• North 200 Road is closed at U.S. Highway 59 for frontage road construction work. The road will be tied to the new frontage road that runs parallel to the new U.S. Highway 59. Work is scheduled to be completed in late 2012.

U.S. Highway 56

• A bridge replacement project is under way just west of the U.S. Highway 75 junction in Osage County. About .44 mile west of the junction, both eastbound and westbound lanes of U.S. Highway 56 will be closed to all but local traffic. A marked detour will take drivers through Burlingame to Osage City and then back to U.S. Highway 7. The project is expected to be finished in mid-June.

Interstate 70

• Kansas Turnpike Authority is reconstructing a three-mile stretch of highway just east of Lawrence. Traffic will be narrowed to one lane in each direction from mile marker 208 to mile marker 211. Access to the Lawrence Service Area will remain open. Delays are expected during rush hour. The project will be finished by November.

• A bridge replacement project is under way for the 142nd Street bridge spanning the Kansas Turnpike in Leavenworth and Wyandotte counties. The northbound and southbound lanes on 142nd Street will be closed between Kansas Avenue and Riverview Avenue. The stretch of road will remain closed for the duration of the project. As part of the project, daily lane closures could occur on the eastbound and westbound lanes of I-70 and the right shoulder of the road. The project should be complete in late fall.

• In Wyandotte County, both eastbound and westbound directions will be reduced to one lane from 118th Street to Interstate 435 for pavement repair work. Construction begins at 7 p.m. Monday and reopens to all traffic at 6 a.m. Tuesday. The project is expected to last until June.

Interstate 435

• A bridge painting project at the Johnson Drive interchange is under way. The work will require varying lane closures that will reduce northbound and southbound traffic along I-435 down to one lane at a time. The lane reductions will occur from 7 p.m. to 6 a.m. Monday through Friday. The ramps will remain open. The project should be completed by mid-July.

Interstate 35

• Northbound travel will be reduced to one lane from Lone Elm Road to Santa Fe and 135th Street for around-the-clock pavement repairs. It will reopen to all traffic at 5 a.m. Monday. Project work is scheduled to be completed on Monday.