Archive for Saturday, November 24, 2001

Panorama: Clinton Lake intake structure and control tower

November 24, 2001


This view of Clinton Lake and the dam was produced atop the intake structure and control tower for the spillway water outlet below the dam.

Cinton Lake was built and is maintained by the U.S. Army Corps of Engineers and was authorized under the Flood Control Act of 1962. The closure of the land used for the lake was completed in 1975, construction of the dam began on Nov. 30, 1977, and the lake opened for multi-use operations in April 1981.

The Quicktime plug-in is required to view this image, if you don't have it you can download it from

This 360-degree panorama was produced at 1:30 p.m. on Wednesday, Nov. 21.

For more details about the lake and the Corps of Engineers, visit